Installation Readiness Standards

Site readiness requirements for a successful glass installation.

standardsinstallationpdf

Installation Readiness Standards

A successful installation starts with a prepared site. Adhere to these standards to avoid delays.

Download PDF Version

Readiness Criteria

  • Blocking: 2x backing required at all hinge and clamp locations.
  • Surfaces: Tile/stone must be set and grouted.
  • Curb Slope: Curbs must be pitched 3/16" to 1/4" towards the drain.
  • Clearance: Work area must be clear of construction debris and other trades.